Knitting Update
It has been rather quiet here, must be all the knitting we are doing, so here is a project update on what is on my needles....
QUIDDITCH SWEATER: I have about 9" done on the back. The width is measuring correctly so my gauge calculations were correct (math rocks!)
DUMBLEDORE SCARF: Washed, blocked and fringe added to one end. I am not a lover of making fringe, but it needs to be done. Pictures when it is all completed.
SILK/CASHMERE SWEATER: a non-HP project with a tragic history (see my LiveJournal for details). I have decided to make it a vest rather than a mock turtleneck, I just don't have enough of the yarn to make the sleeves. I will have some leftover which I can incorporate into a house project, being it is a silver-grey color.
QUIDDITCH SWEATER: I have about 9" done on the back. The width is measuring correctly so my gauge calculations were correct (math rocks!)
DUMBLEDORE SCARF: Washed, blocked and fringe added to one end. I am not a lover of making fringe, but it needs to be done. Pictures when it is all completed.
SILK/CASHMERE SWEATER: a non-HP project with a tragic history (see my LiveJournal for details). I have decided to make it a vest rather than a mock turtleneck, I just don't have enough of the yarn to make the sleeves. I will have some leftover which I can incorporate into a house project, being it is a silver-grey color.
1 Comments:
At 10:00 AM, Misty said…
yay! i can't to see pictures of all of these! :)
Post a Comment
<< Home